Ding, dong, the deck is done!

IT WAS DOWN TO THE FRIGGIN’ WIRE, but at 5:32 p.m. on July 31, 2025, I jubilantly fulfilled my pledge to be done by the end of this month with replanking the sizable deck that wraps around Nuthatch Cabin. It was a project begun several years ago.

Whew!

The final stretch, just completed. The lighter planks at the far end will match the rest after a second coat of stain.

I’d have finished last Sunday if I’d not discovered serious dry rot in one of the very last supporting beams I exposed when prying up old planks. Once I’d scraped out the rotten wood I could almost stick my fist into the hole.

I solved that with a can of Bondo, the gooey, hard-curing polyester putty from 3M that car restorers love. It has brought new life to many a rusted out fender on a ’53 Studebaker. I happened to have an unopened can I’d bought years ago for another project but never used. It was still in good shape (no rust on the can!) and did a dandy job repairing the rotting beam.

While that repair cured good and hard, I took a couple of days off the deck repairs for an overnight campout aboard WeLike with my friend Tom from Orcas Island. We lucked into dock space at Prevost Harbor and had fun exploring Stuart island.

Tuesday sunset at Prevost Harbor in the San Juans.

Back at the project today, I finished the last 10 square feet of deck replanking. All that remains is trim work on the railings and a second coat of wood treatment on the final new planks. But it’s done enough to celebrate.

Over the month of toil, I’ve memorized the words to every song on Jimmy Buffett’s “Beaches” album, gotten a tan George Hamilton might have envied, battled sciatica (all that bending) and carpal tunnel issues (all that prying and hammering), and done my best to keep Galley Cat from leaving paw prints in the fresh stain.

Cheers, friends! Tomorrow is August. Right now, I’m pouring a glass of wine and putting my feet up.

It’s July! All hands on deck!

Hemlock (the darker wood) started my deck project, with golden cedar now the lumber of choice on this completed first phase of my deck renovation. But it’s not all done yet…

A QUICK JULY HELLO from Center Island, where summer means outdoor projects.

Months ago I committed to setting aside this summer to finally complete the replanking of my 25-year-old, rapidly rotting cedar deck, which had never been treated with any preservative. I started the project a few summers ago in bits and snatches.

The lumber must all be brought over from Sunset Builder’s Supply on Lopez Island. That endeavor is limited by how many 8- and 9-foot planks I can fit into the back of my old Ford pickup, Ranger Rick, and into the cabin of my 20-foot cruiser, WeLike.

The thickness of my wallet has played a role as well. Cedar decking currently sells for $1.06 per foot on Lopez. That’s about 7 cents more than it goes for in mainland Mount Vernon, but a relative bargain compared to the $1.50+ I was paying on Lopez at the height of supply-challenged COVID.

So it’s been a piecemeal effort, involving many hours of yanking nails, prying up old planks, sawing new planks, staining them with a cedar-tone preservative, and drilling and screwing them into place. I’ve even been adding waterproofing caulk atop underpinning supports to lengthen their lifespan.

So, expensive, slow and methodical.

Despite the tortoise pace, over the course of several summers I’ve managed to renew the largest deck area, the 15-foot-by-19-foot surface where I have Adirondack chairs and an umbrella table for entertaining when neighbors drop by for a cold beer or a barbecue.

But plenty remains. Five-foot-deep sections of deck span the front of Nuthatch Cabin and wrap around to the front steps. Here, while I’ve concentrated efforts elsewhere, planks have been gradually collecting moss and lichen and slowly rotting away to the point that arriving guests might just fall through next time they visit. Not quite the welcome I’m looking for.

So, at the end of June I got out the measuring tape. I determined that I needed 651 board feet of lumber to complete the project.

New cedar planks are gradually replacing old across the front of Nuthatch Cabin.

Without delay, I hopped aboard WeLike and spent day after day ferrying cedar from Lopez Island. Other than one quick mid-month trip to Seattle for a doctor appointment and a bit of socializing with friends, I’ve set aside the entire month of July to finish the rebuild. (Today is a rare day of rain, so I get a day to write.)

Just checked my bank statement. I’ve already spent $617 on lumber for this final phase of the rebuild. Not to mention the cost of caulk, stain, deck screws and new Velcro-fastened kneeling pads. The old ones, purchased at the rebuild’s outset, were now held together by duct tape and about as effective as strapping old kitchen sponges onto my 69-year-old knees.

With the mostly sunny days we’ve had, the work has been pretty much nonstop. The days can be hard but the progress is satisfying. In college I read Robert Pirsig’s “Zen and the Art of Motorcycle Maintenance.” This is like that, but for homeowners. When I groaned a bit about aching joints, my friend Daniel comforted (?) me with a reminder. “The deck lasted 25 years. You’ll never have to replace it again!”

Unless I live to be 94. Not going to think about that.

Keep in mind that I live on a remote island with no trash-removal service. So once the deck is all done, I need to dispose of a large pile of old rotten wood. Can you guess where I’ve been storing it in the meantime? Under the deck!

I’m not going to dwell on that right now, either.